Fire department and police station in Goeppingen-Jebenhausen. Two functions under one roof.

Builder
City Goeppingen
Completion
2021
No items found.

For operational purposes and accessibility, the fire department and the police needed an optimal connection to the local transportation network - the joint accommodation of both facilities at one location has been consistently implemented here.

Project data

The construction project for the new building in the Jebenhausen district of Göppingen provides space for the local police station and the local volunteer fire department. The joint new building has clearly separated uses and separate entrances on the one hand, but is designed as a joint cuboid building with a length of around 47 meters.

The fire station itself consists of an administrative area with an adjacent vehicle hall. The two-story administration area in solid concrete construction has concrete ceilings above the first floor and upper floor as well as in the stairwell. Rooms close to the operations area, such as changing rooms and radio room, are connected to the vehicle hall on the first floor with direct access. Training rooms with a kitchenette, youth room, instrument storage and administration area are located on the upper floor. These are connected to the hall via a gallery.

No items found.

The single-story vehicle hall with three parking spaces for fire engines and a separate garage for police vehicles is designed as a lightweight construction with reinforced concrete columns and a wooden supporting structure above. The vehicle hall is completed by four sectional doors, a concrete floor slab, ceiling radiation for temperature control and a designated storage area.

No items found.

The two-story police station is designed in a compact concrete solid construction with an open staircase. The spatial program is based on the functional and necessary service procedures of the police. On the first floor, there is the operations management with direct contact to the visitors' lock, as well as the interrogation room with adjoining custody room and a storage room, which is directly accessible via the police garage. Other rooms such as post management, administrative area and changing facilities are located on the upper floor.

The flat roof consists of a two-percent sloped and insulated construction with extensive greening. In addition, a photovoltaic system was installed on the roof. The roof surface including top layers for the green roof runs continuously over the administration area, vehicle hall and police station. The building's color-coated, thermally insulated and curtain wall metal façade with designed profiles gives it a valuable, striking characteristic.